What is best way to seal up/get ready a system for later vacuum and charge?
Posted: Wed Oct 04, 2023 6:27 pm
What is best way to seal up/get ready a system for later vacuum and charge?
By the time I get my system together it will be colder than 80deg here in Albuquerque which I read on here is not recommended for charging and I’ll still be at 5,500 ft which is an additional problem for vacuuming the system. Cold and high.
After the system is assembled I’ll be taking a trip to sea level and hotter temperatures so thinking I can do the vacuum and charge when I get there?
If possible, I’d like to leak test the system before heading out on the trip so I can just vacuum/charge when reaching hot temps and low elevation.
1) What process/material would be recommended for pressure leak testing for this scenario?
2) What/how would be recommended for sealing or filling the system with something else until reaching hotter temps in lower elevations?
Maybe leak test and/or fill with Nitrogen? at ___? psi (I'd have to buy a nitrogen tank and fittings)
Maybe install oil and receiver only when ready to vacuum/charge at lower elevations?
Maybe install a “spacer/connector” instead of the receiver for the testing and temporary sealing of the system?
Thanks for your thoughts.
By the time I get my system together it will be colder than 80deg here in Albuquerque which I read on here is not recommended for charging and I’ll still be at 5,500 ft which is an additional problem for vacuuming the system. Cold and high.
After the system is assembled I’ll be taking a trip to sea level and hotter temperatures so thinking I can do the vacuum and charge when I get there?
If possible, I’d like to leak test the system before heading out on the trip so I can just vacuum/charge when reaching hot temps and low elevation.
1) What process/material would be recommended for pressure leak testing for this scenario?
2) What/how would be recommended for sealing or filling the system with something else until reaching hotter temps in lower elevations?
Maybe leak test and/or fill with Nitrogen? at ___? psi (I'd have to buy a nitrogen tank and fittings)
Maybe install oil and receiver only when ready to vacuum/charge at lower elevations?
Maybe install a “spacer/connector” instead of the receiver for the testing and temporary sealing of the system?
Thanks for your thoughts.